Manual adjustments on the SendPro MailCenter

You may need to make manual adjustments on your SendPro MailCenter before you run a job.
Products affected: SendPro® MailCenter 1000, SendPro® MailCenter 2000, SendPro® MailCenter 3000

You may need to make the following manual adjustments before you run a job.

For all systems:

  • Set the Thickness Adjustment Knob

For optional features:

  • Adjust the Side Guide
  • Set the Wet/Dry Sealer Lever
  • Adjust the Drop Stacker

You can pivot the touchscreen display to a convenient position by moving it up, down, left or right. If the touchscreen does not respond when you touch it, you can also calibrate the touchscreen.

Related topics

UPDATED: December 19, 2022